Aug 2, Saturday (August, 2025)

  • image
  • image
  • image
  • image
  • image
  • Morning yoga and breakfast outside on the back deck
  • Join Corey in rebuilding his shower – first help by cleaning his demo work – then start sawing wood to make the structure more secure – then help with putting the goboard up on the wall
  • During all this we had no water – Miriam made us lunch – then towards the end she left to pre order our burrito dinners
  • Drive to meet Miriam for dinner – then go to Lowe’s and do some of the shopping for stuff to finish the shower – specifically to finish the plumbing

*required

*required (will not be published)

Allowed html: <a href="">, <b>, <strong>, <em>, <i>, <strike>, <code> and <blockquote>